Siddhi Royal Palm Phase 1 Overview

Siddhi Royal Palm Phase 1
atgaon under construction

Siddhi Royal Palm Phase 1

24.0 L - 35.08 L
2BHK 1BHK Residential Commercial
Address: Shahapur, Beyond Thane, Thane

Builder: Siddhi Developers

Developer: Siddhi Developers

Rera No.: P51700052162

Project Area: 0.52 Acres

Possession: July, 2027

Status: Under Construction

Total Towers: 2

Total Units unit: 84

Siddhi Royal Palm Phase 1 Details

Siddhi Royal Palm Phase 1 is a project by Siddhi Developers in Thane. It is a Under Construction project. Siddhi Royal Palm Phase 1 offers some of the most conveniently designed Apartment. Located in Kalambhe, it is a residential project. The project is spread over 0.52 Acres . It has 84 units. There are 2 buildings in this project. Siddhi Royal Palm Phase 1 offers some of the most exclusive 1 BHK, 2 BHK. As per the area plan, units are in the size range of 362.0 - 519.0 sq.ft.. Launched in July 2023, Siddhi Royal Palm Phase 1 is slated for possession in Jun, 2027. The address of Siddhi Royal Palm Phase 1 is Shahapur. Siddhi Royal Palm Phase 1 ensures a coveted lifestyle and offers a convenient living. It offers facilities such as Power Backup. Some other provisions include access to Storm Water Drains, Sewage Treatment Plant. There is provision for Closed Car Parking. The project is RERA compliant and fulfils all necessities as required by the authorities. RERA ID of Siddhi Royal Palm Phase 1 is P51700052162. Till date, Siddhi Developers has developed 1 projects with a focus on healthy and sustainable lifestyle. Kalambhe is well-connected to other parts of the city via an extensive road.

Atgaon is a small village in Thane district, Maharashtra state. Atgaon translates to "eight villages" in Devangiri. It was the location of the DD serial Intezaar in 1991. In addition to Atgaon village, the station also serves the nearby Pundhe industrial area and village. it is situated on the Central line of the Mumbai Suburban Railway network. Asangaon is the previous stop and Thansit is the next stop.

Storm Water Drains
24X7 Water Supply
Electrical meter Room
Water Conservation
Power Backup
Rain water Harvesting
Closed Car Parking
Sewage Treatment Plant

Tower Configuration :NA
Work Progress :
%
Possession Date : July, 2027
Scoring Rating: NA (balanced)
Scoring Ratio: NA
Type: 2bhk, 1bhk
Categories: residential, commercial
Total Floor : NA
Residential Units : NA
Commercial Units : NA
Total Units : 84
Residential Sold Units : NA
Commercial Sold Units : NA
Total Sold Units : NA
Residential Available Units : NA
Commercial Available Units : NA
Total Available Units : NA

Siddhi Royal Palm Phase 1 : Legal Documents

No data available


No data available

No data available

No results

No data available

No data available

Leave a Private Review

Please log in to leave a private review for this property.

Similar Properties in atgaon